Basic Information

BrandHongQi
SeriesH5
Year2021
First Registration2021/01
Mileage19,700km
Transfer Count0times
FuelGasoline
TransmissionDCT
Engine1.5T 169 L4
ColorBlack
Seats-

Condition Description

Low mileage
0 transfers

Configuration Highlights

✓Keyless Entry
✓Keyless Start
✓Child Seat Anchors
✓Power Liftgate
✓ESP Stability Control
✓Backup Camera
✓360-Degree Camera
✓LED Headlights
✓Daytime Running Lights
✓Ambient Lighting
✓Cruise Control
✓Paddle Shifters
✓Leather Seats
✓Automatic Climate Control
✓Power Seats
✓Navigation System
✓Bluetooth Hands-free
✓Auto Park
✓Rear Parking Sensors
✓Safety Curtain Airbags

Q&A

More

How long is your quotation valid? What is the basis for re-quoting after it expires?

Our FOB vehicle quotes are typically valid for 72 hours (as domestic retail vehicle sources can be sold at any time); sea freight quotes are valid for 7 to 14 days (depending on shipping line changes). After expiration, prices need to be recalculated based on real-time exchange rates and domestic procurement conditions.

Is China's "National VI B" emission standard equivalent to Europe's Euro VI standard?

From a technical perspective, China's "National VI B (China VI-b)" is one of the strictest emission standards globally, with limits on carbon monoxide, nitrogen oxides, and particulate matter that are even stricter than some of Europe's Euro VI standards. However, the two are not legally recognized by each other, depending on your country's import regulations.

What should a purchase contract with a Chinese used-car exporter include to protect me?

A solid contract is your main protection in a cross-border deal. It should specify: 1. Vehicle identification: VIN, year, mileage, trim level, and photos of the actual car appended as an annex — not just「a 2021 Toyota」. 2. Condition guarantees: no accident, no flood or fire damage, no structural repairs, supported by a third-party inspection report referenced in the contract. 3. Price and Incoterm: total amount, currency, the named port, and whether freight and insurance are included. 4. Payment schedule: e.g., 20–30% deposit after contract signing, balance against copy of the Bill of Lading. Avoid 100% upfront. Use T/T to the company's corporate bank account only — never a personal account. 5. Timeline: inspection date, estimated loading date, and latest shipment date, with remedies if delayed. 6. Dispute clause: governing law and arbitration (CIETAC or your local chamber) rather than foreign court litigation. Ask for the contract in English (or bilingual) with the supplier's company chop. A company that refuses a written contract or pushes for full prepayment is a red flag.

HongQi H5 1.5T 169 L4

红旗H5 1.5T 自动 旗韵版

EXW: $10,967
Car CodeSWA1547660
Publish Date