Sold

Basic Information

BrandBYD
SeriesSong Plus New Energy
Year2023
First Registration2023/06
Mileage91,000km
Transfer Count0times
FuelElectric
TransmissionOther
Engine-
ColorWhite
Seats-

Condition Description

Minor collision at left front, headlight replaced. Left rear door replaced. Left C-pillar has bodywork/panel repair. Does not pass third-party inspection. Other panels retain original paint.

Minor collision at left front, headlight replaced. Left rear door replaced. Left C-pillar has bodywork/panel repair. Does not pass third-party inspection. Other panels retain original paint. One previous ownership transfer. Odometer guaranteed accurate. Non-commercial vehicle.

Document Information

Inspection Expiry Date-
Warranty Expiry Date-
Insurance Expiry Date2027/06

Q&A

More

What should I do if I find obvious defects on the exterior that were not mentioned in the inspection report after receiving the car?

Please take timestamped photos and videos at the first opportunity when picking up the car at the destination port (before leaving the port area). We will compare these with the final archived images taken at the Chinese port before shipping. If it is confirmed that we missed reporting it during the pre-shipment inspection, we will provide compensation for parts or labor costs based on the severity of the defect; if it is new physical damage incurred during shipping, the insurance claim process will need to be initiated.

Is the vehicle's catalytic converter in good condition? Will it be maliciously removed before export?

The catalytic converter contains precious metals, making it a target for theft. During chassis inspection, we check if the welding points of the catalytic converter are in their original state. Once verified, the vehicle will be sealed after being handed over to port logistics to prevent disassembly and resale.

If the shipping company's basic freight rate (GRI) suddenly increases during the period after I place the order and before paying the final amount, who covers the difference?

Our freight rate quotes have a clear validity period. If the buyer delays the deposit payment and misses the scheduled price lock, the GRI (General Rate Increase) charged by the shipping company must be fully covered by the buyer before booking and loading can be arranged.